Abstract

Construction of a new primary beam line, called the B-line, started in 2013 at the J-PARC Hadron Experimental Facility. The B-line is branched at the middle of an existing primary proton beam line (A-line) in the beam switching yard (SY), which is the connecting tunnel between the Main Ring (MR) and the Hadron experimental hall (HD-hall). At the branching point, about 0.1% of the primary beam is kicked off at 5 degrees using a Lanbertson magnet and two septum magnets. The Lambertson magnet has a field free hole in its yoke. The proton beam that goes through a field region is separated from the A-line, and it is extracted to the B-line. The rest of the beam that goes through the field free hole is transported through the existing primary beam line. Since a significant beam loss as much as 420 W occurs at the edge of field free hole, the magnets near the Lambertson magnet are operated under a very high radioactive environment. We have developed a “mini-chimney system” regarding easy maintenance of those magnets. The mini-chimney means a vertical tower of approximately 1m in height. The tower is comprised of water pipes, power electrodes, and signal cables for safety interlock. Those can be easily connected and disconnected at the top of chimney on the ceiling iron shields. In this paper we summarize the maintenance scheme developed for the B-line, as well as the design of B-line.In May 2020, the first proton beam was successfully extracted to the B-line by means of the Lambertson and the septum magnets. Up to now, the 10 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">10</sup> protons per 5.2 sec accelerator cycle shot have been available.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call