Abstract

I study the optimal choice of investment projects in a continuous time moral hazard model with multitasking. While in the first best, projects are invariably chosen by the net present value (NPV) criterion, moral hazard introduces a cutoff for project execution which depends on both a project's NPV as well as it's signal to noise ratio (SN). The cutoff shifts dynamically depending on the past history of shocks, current firm size and the agent's continuation value. When the ratio of continuation value to firm size is large, investment projects are chosen more efficiently, and project choice will depend more on the NPV and less on the signal to noise ratio.The optimal contract can be implemented with an equity stake, bonus payments, as well as a personal account. Interestingly, when the contract features equity only, the project selection rule resembles a hurdle rate criterion.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.