Abstract
Avionics Full Duplex Switched Ethernet (AFDX) standardized as ARINC 664 is a major upgrade for avionics systems. The mandatory certification implies a worst-case delay analysis of all the flows transmitted on the AFDX network. Up to now, this analysis is done thanks to a tool based on a Network Calculus approach. The more recent Trajectory approach has been proposed for the computation of worst-case response time in distributed systems. This paper shows how the worst-case delay analysis of the AFDX can be improved using an optimized Trajectory approach. The Network Calculus and the Trajectory approaches are compared on a real avionics AFDX configuration. Moreover, an evaluation of an upper bound of the pessimism of each approach is proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.