Abstract
ABSTRACT The Khuff gas is the main source of energy in the State Of Bahrain. The production from Khuff reservoir was started in 1969 when the country decided to embark into a major industrialization program. Since that time, 20 wells were drilled and completed in the Khuff zones and all these wells have been producing smoothly and without any major mechanical failure. Recently, the later stage wells which are mostly in peripheral locations have exhibited some problems like relatively low deliverability compared to other Khuff wells, high H2S production and downhole scaling problems. This paper discusses the recently detected problems and suggests remedial work. Also, it proposes modifications in the current completion of Khuff wells specifically the completion design, completion fluid, sequence of perforation, testing and stimulation of the producing zones.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.