Abstract

The article considers the possibility of increasing the safety of NPP power units operation by improving the quality of steam generator water supply control. The quality of control is improved by introducing a new information signal about steam humidity before the turbine. The necessity of introducing this signal is substantiated. The article describes the properties of the object of regulation by various channels, the initial coordinate for which is steam humidity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.