Abstract

The article presents the results of computational experiments confirming the efficacy of the phase-shifting transformer (PST) as a type of a phase-shifter, which is to be installed at the backbone 750/330 kV substation Belorusskaya, in the repair and post-emergency states of the Belarusian power system, as well as an analysis of technical and economic performance indicators.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.