Abstract
The article presents the results of computational experiments confirming the efficacy of the phase-shifting transformer (PST) as a type of a phase-shifter, which is to be installed at the backbone 750/330 kV substation Belorusskaya, in the repair and post-emergency states of the Belarusian power system, as well as an analysis of technical and economic performance indicators.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have