Abstract

The article presents the results of computational experiments confirming the efficacy of the phase-shifting transformer (PST) as a type of a phase-shifter, which is to be installed at the backbone 750/330 kV substation Belorusskaya, in the repair and post-emergency states of the Belarusian power system, as well as an analysis of technical and economic performance indicators.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call