Abstract

This research was conducted at a make to order production system company which is engaged in the car body of the vehicle. One of the products produced is dump truck which is one kind of transportation for the transport of goods equipped with hydraulics to facilitate goods’ loading and unloading process. The company has 7 work stations with different cycle times. Companies often experience delays in order delivery. The production process on the production floor has not been done optimally where there is a build up of work in process in some work centres. The build up of work in process (WIP) products is seen in the welding and painting stations. Stacking that occurs on the production line may cause the company to be liable for damages due to delays in product completion. The WIP occurs due to unbalanced paths can be seen from the variance of cycle time of each station is very diverse. The time difference of each work element is due to the allocation of work elements to each work centre unevenly. On the basis of the allocation of uneven work elements, the dump truck assembly line is made. The analysis is done by using Moodie Young and Comsoal method to do the balancing of production line. The result of layout improvement by using systematic layout planning (SLP) method is change the composition of the work centre from 7 into 4 work centre which enables the movement of material to be more effective and efficient so that it can get an efficient and effective production trajectory and can solve existing problems. The result of the track balancing is then used as a guide in constructing a new layout based on the balancing result with the most optimum method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call