Abstract
The operation of Bhadra reservoir project is studied using optimization (overyear and within year storage model) and simulation (with both historic and synthetically generated monthly streamflows) based on a 52-year record of monthly inflow data for irrigation and hydropower generation. Bed turbine operation is found to be the key issue in maximizing the total hydropower production. The reservoir operation is studied for thirteen different policies of bed turbine operation using simulation. These simulation runs are carried out for a specified irrigation demand with historic data. The probability distribution of the maximum possible hydropower production is arrived at by simulating the reservoir operation with 4 different sets of synthetically generated monthly streamflows, each having sequences of different lengths, for two promising policies. A comparison of results made with the actual operation over a 11-year period shows that substantial increase in the total hydropower generation is possible with the identified policies without undue deficits in meeting the specified irrigation demands.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.