Abstract

Abstract Accurate runoff prediction is vital in efficiently managing water resources. In this paper, a hybrid prediction model combining complete ensemble empirical mode decomposition with adaptive noise, variational mode decomposition, CABES, and long short-term memory network (CEEMDAN-VMD-CABES-LSTM) is proposed. Firstly, CEEMDAN is used to decompose the original data, and the high-frequency component is decomposed using VMD. Then, each component is input into the LSTM optimized by CABES for prediction. Finally, the results of individual component predictions are combined and reconstructed to produce the monthly runoff predictions. The hybrid model is employed to predict the monthly runoff at the Xiajiang hydrological station and the Yingluoxia hydrological station. A comprehensive comparison is conducted with other models including back propagation (BP), LSTM, etc. The assessment of each model's prediction performance uses four evaluation indexes. Results reveal that the CEEMDAN-VMD-CABES-LSTM model showcased the highest forecast accuracy among all the models evaluated. Compared with the single LSTM, the root mean square error (RMSE) and mean absolute percentage error (MAPE) of the Xiajiang hydrological station decreased by 71.09 and 65.26%, respectively, and the RMSE and MAPE of the Yingluoxia hydrological station decreased by 65.13 and 40.42%, respectively. The R and NSEC of both sites are near 1.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.