Abstract
In this study, a stacked integrated system with anaerobic bioelectrochemical system (BES) and aerobic moving bed biofilm reactor (MBBR) was developed to improve the decolorization and mineralization of azo dye. This stacked BES-MBBR exhibited better performance with acid orange (AO7) decolorization of 96.4 ± 0.6% and chemical oxygen demand (COD) removal of 87.7 ± 4.4%. Contribution of each module in the BES and MBBR stages indicated that BES modules enhanced the pretreatment process in AO7 decolorization, and MBBR played an important role in further removal of COD. The mechanism analysis indicated that the azo bond was cleaved with reductive decolorization at biocathode in the anaerobic BES stages, and then the intermediate products can be further oxidized with COD removal in the aerobic MBBR stage. This work demonstrated that the integrated system with stacked anaerobic BES and aerobic MBBR could provide a promising way for the pretreatment and post-treatment of refractory wastewater.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.