Abstract
This work develops a possibilistic programming method to solve multi-product and multi-time period production/distribution planning decision PDPD problems involving imprecise goals, forecast demand and cost/time coefficients in uncertain environments. The proposed method attempts to simultaneously minimize total production and distribution costs and total delivery time in relation to inventory levels, available machine capacity and labor levels at each source, as well as forecast demand and available warehouse space at each destination, and considering the constraint of available budget. An industrial case is used to demonstrate the feasibility of applying the proposed method to real-world PDPD problems. Moreover, several significant management implications regarding the practical application of the proposed method are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.