Abstract

This work presents a possibilistic linear programming (PLP) method for solving the integrated manufacturing/distribution planning decision (MDPD) problems with multiple imprecise goals in supply chains under an uncertain environment. The imprecise PLP model designed here aims to simultaneously minimize total net costs and total delivery time with reference to available supply, capacities, labor levels, quota flexibility and cost budget constraints at each source, as well as forecast demand and warehouse space at each destination. The proposed method achieves greater computational efficiency by employing the simplified triangular distribution to represent imprecise numbers. An industrial case is used to demonstrate the feasibility of applying the proposed method to a real MDPD problem. Overall, the proposed PLP method provides a practical means of solving the multi-objective MDPD problems in an uncertain environment, and can effectively improve manufacturer/ distributor relationships in a supply chain.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.