Abstract

The ASME B&PV code section XI adopted the performance demonstration requirements (Appendix VIII) for the ultrasonic examination of nuclear power plant piping weld in the 1989 winter addenda for the first time. Korea Electric Power Research Institute(KEPRI) and Korea Hydro and Nuclear Power Company(KHNP) finished developing Korean Performance Demonstration(KPD) system for the ultrasonic examination to apply pressurized light-water and pressurized heavy-water reactor power plants piping weld in accordance with ASME code section XI, appendix VIII on January 2004. KEPRI has been accomplishing the performance demonstration for nuclear power plant piping weld ultrasonic examination in Korea from April 2004. This paper describes the implementation status of the performance demonstration for nuclear power plant piping weld ultrasonic examination in Korea.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.