Abstract

The development of infrastructure development in Indonesia is being intensively carried out by the government to meet the needs of the community. Infrastructure development is often faced with various obstacles that can disrupt the project. To ensure the sustainability of the project, it is necessary to apply Value Engineering to identify opportunities for cost savings and solve problems so as to get maximum value without reducing project quality. The purpose of the research is to analyze the structure, determine the alternative, types and construction methods chosen to make the project cost efficient. Value Engineering is applied to the foundation and deck slab work of the Fly Over Replacement Construction Project JPL 64 Km 38-897 Lintas Surabaya-Solo using the AHP method with the help of expert choice. Based on the results of the Value Engineering analysis, an alternative bore pile d-120 foundation was obtained in the foundation work and a change in the cantilever elbow support method in the deck slab work. The cost efficiency results obtained after Value Engineering amounted to Rp15,108,214,225 or 10%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.