Abstract

Building construction requires selecting efficient construction methods to achieve the desired project objectives. This research aims to compare conventional and modular construction methods in the implementation of walls and floor plates, with a focus on cost and time analysis. The case study taken is the construction of the Satpol PP Building. This research method uses a quantitative approach by collecting primary and secondary data. Primary data was obtained through field observations and interviews with parties involved in the project, while secondary data was obtained from project documents, literature and other related references. Data analysis was carried out with comparing the total costs and time required for each construction method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.