Abstract

Abstract: Industries today are working towards decentralizing their structure to get near to the customer to know the actual demand of customer in order to reduce lead times and trying to become more flexible in order to fulfill the customer‘s demand and improve the level of satisfaction. They had also implemented various improvement methodologies like lean and, Six Sigma etc. to achieve the goals. The work in this paper is a study performed at Cummins Turbo Technologies, Dewas. Turbo Plant focuses on achieving Manufacturing functional excellence under Operation Excellence Project. Keywords: Operation Excellence, Manufacturing Excellence (MEFE), TAKT time, Line Balancing, SMED, Setup reduction, Standard working methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.