Abstract

Nuclear Power Plant (NPP) Construction is a long-term project with huge scales of construction data and it requires a large number of materials, labor and equipment. Also it is a grand scale project that invested with billions to build a major power supply system. To effective manage NPP construction project, it is essential to cooperate with each entities such as owner, contractor, subcontractor and regulatory agency, etc. Therefore, it is necessary to implement an information system that can be improved productivity through collaboration among construction companies and business processes in the NPP construction. By implementing information technology during project (distribution and management, pursuing integration and interfacing information with other contractors), each stage has been developed segmental information technologies. Implementing a total project management system in NPP is a key element in this paper. Therefore, the purpose of this paper is introducing an integrated information technology system for NPP. Actual examples will be given from the Uljin Nuclear Power Project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.