Abstract

This research was conducted aiming to describe and analyze the implementation of the public green open space structuring policy in Sidoarjo Regency and to describe and analyze the constraints in the public green open space structuring policy in Sidoarjo Regency. The method used in this study is a descriptive qualitative method with the technique of determining the informants using purposive sampling technique. Data collection techniques through interviews, observation, and documentation as well as data analysis techniques through data reduction, data presentation, and conclusion drawing. The results of this study indicate that of the four dimensions of policy implementation according to Edward III which includes communication, resources, disposition, and bureaucratic structure. The first dimension result is that communication has not gone well because there is no information delivery to the public in the form of socialization related to green open space. Resources in the implementation of public green open space structuring policies are inadequate. Disposition in the implementation of the public green open space structuring policy is appropriate and the gardening section as the implementer of the green space program. The bureaucratic structure has not gone well due to the absence of SOP (Standard Operating Procedure) as a guideline for program implementation and found several obstacles that hamper the implementation process, namely budget constraints, lack of field supervisors, and lack of community participation due to lack of socialization.

Highlights

  • This research was conducted aiming to describe and analyze the implementation of the public green open space structuring policy in Sidoarjo Regency and to describe and analyze the constraints in the public green open space structuring policy in Sidoarjo Regency

  • The results of this study indicate that of the four dimensions of policy implementation according to Edward III which includes communication, resources, disposition, and bureaucratic structure

  • The first dimension result is that communication has not gone well because there is no information delivery to the public in the form of socialization related to green open space

Read more

Summary

Implementation of Public Green Open Spatial Planning Policy in Sidoarjo Regency

Ruang Terbuka Hijau Publik Di Kabupaten Sidoarjo. Implementasi Kebijakan Penataan Ruang. 6:2. Sumber daya dalam pelaksanaan implementasi kebijakan penataan ruang terbuka hijau publik belum memadai. Disposisi dalam pelaksanaan implementasi kebijakan penataan ruang terbuka hijau publik sudah sesuai dan seksi pertamanan sebagai pelaksana program RTH. Struktur birokrasi belum berjalan baik karena belum adanya SOP (Standart Operational Prosedure) sebagai pedoman pelaksanaan program serta ditemukan beberapa kendala yang menghambat proses implementasi yaitu keterbatasan anggaran, kurangnya petugas pengawas lapangan, dan kurangnya partisipasi masyarakat karena belum adanya sosialisasi. Sedangkan RTH publik adalah ruang terbuka hijau yang dimiliki dan dikelola oleh pemerintah daerah/kabupaten yang digunakan untuk kepentingan masyarakat secara umum. Disebutkan dalam pasal 51 ayat (12) bahwa RTH Sidoarjo memiliki ketentuan yang harus dicapai yaitu minimal 30% yang meliputi 20% ruang terbuka hijau publik dan 10% ruang terbuka hijau privat dari luas wilayah daerah. Dalam pernyataan tersebut bahwa ditekankan untuk proporsi ruang terbuka hijau publik belum tercapai dan sesuai dengan peraturan.

Implementasi Kebijakan Publik
METODE PENELITIAN
Implementasi Kebijakan Penataan Ruang Terbuka Hijau Publik di Kabupaten Sidoarjo
Keterbatasan anggaran untuk program penataan RTH publik di Kabupaten Sidoarjo
Kurangnya Partisipasi Masyarakat Karena Belum Adanya Sosialisasi
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call