Abstract
Ultra-high voltage (UHV) projects are making power system growing lager and resulting in sharp increase of short circuit currents in some area especially in the vicinity of UHV access points. The paper presented the damage of short circuit current increases and common methods to limit fault current. Taking the construction and development of UHV grid in a province of central China as background, the over short circuit currents in 500kV Grid within UHV were showed and several countermeasures including choosing proper UHV access scheme, implementing UHV substation lower voltage bus partition running, installing reactors, optimizing power grid network based on UHV connection point were proposed and then verified by PSASP simulation. The results show those measures are useful to reduce the short circuit current to a reasonable level.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.