Abstract

Deployment of Smartgrid downstream features such as Smart Metering, pervasive control and Distributed Management Systems has brought great opportunities for distribution network planners to optimize the network in more precise methods. Moreover, the advent of Electric Vehicles (EVs) has brought more opportunities for grid optimization. Recent studies stipulate that EVs are able to inject reactive power into the grid by changing their inverter's operating mode. This paper primarily discusses a real-time adaptive Volt/VAr Optimization (VVO) engine, designed to minimize system apparent power losses, optimize voltage profiles, and reduce the operating costs of Switched Capacitor Banks of the grid. The paper goes on to study the impact of EVs on the distribution network VVO, taking into account different EV charging and penetration levels and checks the validity of the proposed algorithm by employing revised IEEE-37 Node Test Feeder in presence of various load types as a case study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.