Abstract

Abstract. The need for efficient and sustainable infrastructure – always critical to a city – is further gaining momentum as urbanisation creates the challenge of sustainably designing, constructing and operating the built environment. The AECOO industry, directly responsible for addressing this challenge, has adopted the use of BIM and GIS to aid in this endeavour. Both BIM and GIS overlap with respect to capturing aspects of the built environment, but are not interoperable by nature. To ensure a consistent and structured way of managing the information produced within these environments, industry standards such as IFC are implemented. Research to date focuses on addressing the integration between BIM and GIS for buildings by delving into the IFC and CityGML interoperability, which has highlighted significant geometric and semantic barriers that in the stage of integration, cannot be easily manoeuvred. The purpose of this paper is to provide an insight regarding the information lifecycle during Design & Construction in the HS2 Rail Infrastructure project and investigate the impact of current information management processes – and in particular Standards such as IFC, – on BIM-GIS interoperability and lifecycle management of an asset. Results demonstrate the levels of mis mapping during the export to IFC which varies depending on the infrastructure asset type. Discussion shows that these can be addressed by the introduction of additional semantic property sets to facilitate downstream BIM-GIS interoperability for O & M, enabling scope for future work.

Highlights

  • The models have been created within Skanska-Costain-STRABAG Joint Venture (SCS JV) in collaboration with Design House” (DH), as per the Modelling Guidelines that have been specified within the High Speed 2 (HS2) Building Information Modelling (BIM) Execution Plan

  • It is important to note that a Type does not have a 1:1 correspondence with an object modelled in the Industry Foundation Classes (IFC) schema, there is information created at this stage in the process that will be lost during export to IFC from AECOsim

  • Current standards have limitations in addressing the infrastructure of the built environment. These limitations, do complicate further the BIM-Geographic Information Science/Systems (GIS) interoperability, but more importantly could lead to poor decision-making during O & M

Read more

Summary

Objectives

The purpose of this paper is to provide an insight regarding the information lifecycle during Design & Construction in the HS2 Rail Infrastructure project and investigate the impact of current information management processes - and in particular Standards such as IFC, - on BIMGIS interoperability and lifecycle management of an asset. The purpose of this paper is to provide an analysis of the Information Management (IM) chain during the stages of Design and Construction of the Skanska-Costain-STRABAG Joint Venture (SCS JV) working on behalf of HS2 (SCS Railways, 2020). Three common Infrastructure Asset Types are examined: Tunnel, Vent Shaft and Civil Works (Embankments). The main research question this paper aims to address is:

Methods
Results
Discussion
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.