Abstract

Approximately 76 m3 (100 yd3) of ready-mixed, air-entrained concrete were placed in a parking lot and driveway at the Schwing America Manufacturing facility in White Bear, Minnesota, on June 21, 1994. This concrete was placed by means of a pump, crane and bucket, and truck-mounted conveyor, and came directly from the chute of ready-mix trucks. Pump configurations were used that allowed unrestricted free-fall of the concrete; a kink in the rubber hose at the end of the line created a slight back pressure and slowed the descent of the concrete. After placement, the concrete was consolidated by an immersion vibrator in some locations and struck off with no further consolidation in other locations. Air content of the fresh concrete was measured by ASTM C231 pressure meters at the truck chutes and at the point of placement. Air content and air-void system parameters of the hardened concrete were determined in accordance with ASTM C457. Actual freeze-thaw performance was evaluated by ASTM C666 for concrete samp...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call