Abstract

The study sets the objective of overall overrun fuel separation into two components. The first one depends on changes in the electric load of the power unit. The second component is influenced by changes of the power unit controlled parameters. The separation leads to the adjustment of technical and economic performance of the power plant unit. These indicators show both the efficiency of the power unit and the overall plant.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call