Abstract

The logic of priorities assignment for workplaces reservation when simulating the manufacturing operations of a batch of machine parts sets is proposed. Examples of combined redundancy of the workplaces in the manufacture of the parts batches with different technological cycles are considered. It is shown that the complex application of situational logic and the logic of the workplaces planned reservation at the imitation modeling of production processes will significantly increase the adequacy of modeling. Keywords imitation modeling; production process; adequacy; routing logic

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call