Abstract

We study multipurpose batch process industries with no-wait restrictions, overlapping processing steps, and parallel resources. To achieve high utilization and reliable lead times, the master planner needs to be able to accurately and quickly estimate the makespan of a job set. Because constructing a schedule is time consuming, and production plans may change frequently, estimates must be based on aggregate characteristics of the job set. To estimate the makespan of a complex set of jobs, we introduce the concept of job interaction. Using statistical analysis, we show that a limited number of characteristics of the job set and the available resources can explain most of the variability in the job interaction.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.