Abstract

Batch processing is becoming more important in the process industries, because of the increasing product variety and the decreasing demand volumes for individual products. In batch process industries it is difficult to estimate the completion time, or makespan, of a set of jobs, because jobs interact at the shop floor. We assume a situation with hierarchical production control consisting of a planning level and a scheduling level. In this paper we focus on the planning level. We use two different techniques for estimating the makespan of job sets in batch process industries. The first technique estimates the makespan of a job set by developing regression models, the second technique by training neural networks. Both techniques use aggregate information. By using aggregate information the presented techniques are less time consuming in assessing the makespan of a job set compared with methods based on detailed information. Tests on newly generated job sets showed that both techniques are robust for changes in the number of jobs, the average processing time, a more unbalanced workload and for different resource configurations. Finally, the estimation quality of the neural network models appears significantly better than the quality of regression models.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.