Abstract

In 1972 and 1973, a winter road crossing eight rivers was built in the James Bay territory to enable the installation of camps and the mobilization of all equipment, materials and fuel needed for the construction of a permanent road leading to the La Grande River. This paper reports on the bearing capacity theory, design, site selection, construction and testing of the ice bridges spanning the main rivers.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call