Abstract

Exploiting the kinetic energy of water currents is considered a smart and cost-effective renewable energy solution without requiring the construction of a dam or of large civil works. Field studies were performed at a selected site along the Ero River, one of the tributaries of River Niger, North-central Nigeria to assess the hydrokinetic energy conversion potentials of the river reach. Relevant data and tools dealing with the hydrology, topography, bathymetry and digital elevation models were used together with year round on-site measurements for the determination of the hydraulic and hydrological parameters. These were used to obtain the instantaneous stream velocities and to compute the power estimates. Preliminary results show that monthly averaged hydrokinetic power of the range 0.034kW-2.3MW can be obtained with the highest values being generated between July and November, with stream velocities above 0.7ms -1 . The highest energy value obtainable was 14.76MW while the lowest was 0.11715W. The values also compare well with estimates gleaned from a previous study. Keywords: Hydrokinetic Power, Energy Resource, River Ero, Water Resources

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.