Abstract

Excavations below the water table are usually undertaken by combining the protection of retaining walls with dewatering by pumping wells. Severe difficulties may arise if the retaining walls have defects. Therefore, their state must be determined and, if needed, the defects repaired or the dewatering system redesigned. The state of underground retaining walls can be evaluated using hydrogeological methods, but these methods are well-established only for linear excavations. The objective of this work is to propose a procedure to evaluate the state of non-linear underground enclosures by analysing the groundwater response to pumping inside the enclosure. The proposed method, which is based on diagnostic plots (derivative of drawdown with respect to the logarithm of time), allows (1) determining if an underground non-linear enclosure has isolated openings or numerous defects and (2) computing its effective conductance or effective hydraulic conductivity. The methodology is tested with data collected during the excavation of a shaft required for the construction of the high speed train (HST) tunnel in Barcelona, Spain. The procedure can be applied using the wells drilled for dewatering. Although a test before the excavation is recommended to evaluate the underground retaining walls (Watertightness Assessment Test), the method can be applied using data collected at the beginning of the dewatering stage.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.