Abstract

The hydraulic external pre-isolator (HEPI) is the first six degrees of freedom active seismic isolation system implemented at the Laser Interferometer Gravitational Wave Observatory (LIGO). Implementation was first completed at the LIGO Livingston Observatory (LLO) prior to LIGOʼs fifth science run, successfully cutting down the disturbance seen by LLOʼs suspended optics in the two most prominent seismic disturbance bands, the microseism (0.1–0.3 Hz) and the anthropogenic (1–3 Hz) bands, by a factor of a few to tens. The improvement in seismic isolation contributed directly to LLOʼs much improved duty cycle of 66.7% and LIGOʼs triple coincident duty cycle of 53%. We report the design, control scheme, and isolation performance of HEPI at LLO in this paper. Aided by this success, funding for incorporating HEPI into the LIGO Hanford Observatory was approved and installation is currently underway.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.