Abstract
Based on one 160m PC bridge project, the field measurement and finite element analysis of the hydration temperature of cast-in-situ box girder on top of pier have been completed. The distrabution of the hydration temperature fields and the rule of the temperature changing with time have been sumed up in this paper. The factors which affect the hydration temperature of cast-in-situ box girder on top of pier were also under discussion here. At last, some measures were put forward to control hydration heat and early age cracking in the cast-in-situ box girder on top of pier.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have