Abstract
Hybrid System in Industrialised Building System (IBS) is combining IBS components with conventional method. Delay has become a familiar issue in construction field. The issues pertaining structure stability when using this combination method leads to delay while installing these two different method components. The combination also could cause a defect jointing. In Industrialised Building System (IBS), even though it is one of the technology methods that can save times, cost, and reduce labour in construction, but there still have constraints such as design issues, lack of experienced worker, and internal and external issues that can affect cost problems. In this study, the suitability structure based on combination method is investigated to discover the affected factors of suitability structure by using Hybrid System which is the aim of this study. The data analysis from quantitative survey shows that the top three affecting the building structure are: 1) weather effects with highest mean of 6.25 followed by 2) delay of jointing process at 6.03 and 3) defects from monolithic jointing at 5.93. Therefore, the amount of average data obtained shows that the most affected structure is the Hybrid System.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Advanced Research in Applied Sciences and Engineering Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.