Abstract

A new technology in construction has implemented Industrialised Building System (IBS) as an adoption of a new method. Till date, the reception of Industrialised Building System (IBS) has been effectively advancing by Construction Industry Development Board (CIDB). Several of exertions have been taken, for example tremendous of research financing, preparing, and building up standard and other showcasing plan. From previous writing and industry report, the appropriation of IBS was practiced gainful to improve the construction quality and profitability and spare expense and also the duration of completion projects. However, there are still a few issues and problems, such as supply chain and design drawing issues, which has always been one of the biggest problems that should be taken care of in the construction industry. Nowadays, Industrialised Building System (IBS) also has been modified in many ways to make it more practical to use in the construction field. The IBS usage becomes a trend and also a requirement for a government project especially in the northern region of Malaysia such as Kedah and Perlis. Hence, this paper focuses on latest review which is about the new method implements in Industrialised Building System (IBS) technology, which is known as a Hybrid System method. This system is not yet to be found since it is one of the pilot projects from the government. Thus, the survey for this paper will evaluate the outcome whether the new Hybrid System method leads to delay in Industrialised Building System (IBS) or it can help to improve the deferrals of construction.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call