Abstract

The use of conventional system such as hydropower plant is no longer sufficient to meet the increasing demand for electricity in Lusaka, Zambia. Therefore, the present study aims to investigate a hybrid system using the available renewable resources (biomass, wind, and solar) in Misisi rural area. To achieve this, a techno-economic analysis is conducted using HOMER Software. The results obtained showed that the hybrid system produces an output power of 73,577 kWh/yr for an estimated consumption of about 60,386 kWh/yr. Moreover, in the hybrid system, the efficiencies of the biomass, solar PV, and wind generators are 37%, 26.9%, and 36.1% respectively. The estimated total capital cost of the whole system is 151,708.84 USD. Conclusively, the results obtained showed that Zambia has the required renewable energy to produce power that can be used to supplement the conventional systems. These findings also revealed that by increasing the uptake of off-grid projects in rural areas in Africa, could lead to many benefits such as improved education, time saving, and job creation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.