Abstract
The characteristics of Korean power systems are large capacity of generation sites and concentrated load in Seoul metropolitan area. According to the national generation facility plan, more generation facilities are needed to be constructed as the electrical demands are forecasted to increase. Moreover, the size of generation sites are expected to increase, too. Therefore transient stability problems become worse and worse. Recently, the necessity of HVDC has been raised to overcome the difficulty of constructing HVAC transmission lines. This paper shows the analysis of transient stability when HVDC transmission system is added to the power system consisting of large generation sites.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The Transactions of The Korean Institute of Electrical Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.