Abstract
In this study, hourly three-minute creep testing is used to elucidate the evolution of the viscoelastic behavior of cement pastes produced with ordinary Portland cement (OPC), limestone Portland cement (LPC), and limestone calcined clay cement (LC3), from 1 to 7 days after production. An innovative test evaluation protocol, accounting for shrinkage, is used to identify values of the elastic modulus, the creep modulus, and the creep exponent, without making assumptions. The S-shaped shrinkage evolution of the LC3 paste is explained by Portlandite dissolution and the associated redistribution of chemical shrinkage-induced compressive stresses to the remaining solid skeleton. The evolution of the elastic stiffness of the LC3 paste is explained by space filling by C-A-S-H phases. The small creep compliance of the LC3 paste is explained by C-A-S-H which creeps less than C-S-H, and by AFm phases which precipitate in nanoscopic slit pores between C-S-H structures, gluing viscous interfaces.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.