Abstract

In the steam flooding process, when steam injection rate is high, wellhead and bottom hole string pressure substantially increased, oil displacement effect is affected. The numerical simulation method was used to study the process of horizontal steam flooding steam injection rate, steam hold on horizontal liquid rate and the number of holes, pore size to wellhead and bottom-hole pressure and the influence of tubing string. The calculation results show that: the steam injection amount was larger, the more pressure on the bottom of the well and string; the pipe diameter holes on the quantity increased, and the bottom of the well and the smaller string pressure. Injecting steam with more liquid rate the higher pressure were on the bottom of the well and string. Only properly reduce steam injection rate and the liquid rate, holes quantity and holes were reduced .the inner diameter tubing stress and bottom holes dramatically risen could be effectively reduced. Key words: Horizontal well; Steam flooding; Numerical simulation; Pore size; Pressure drop

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.