Abstract
This paper presents an evaluation of interfaces at the Network Operations Center NOC (Network Operations Center) in terms of HMI standards and related regulations, as well as the ergonomic monitoring GEDIS guide. The Centre of Operations NOC at the Institute of technology and renewable energy (ITER) is responsible for monitoring the various infrastructures of the Data Centre such as the air conditioning, power supply, fire protection, security, technical centers, wind farms, photovoltaic plants, and different infrastructures deployed around the submarine cable belonging to the Consortium Cana-Link (the cable that connects the mainland and Canary Islands, the earth ring and the Network IRIS). To unify systems and facilitate the NOC personal’s daily tasks, the ITER has been using the BMS system for SCADA software. However, BMS is a software specialist in the management of buildings, and as such BMS software was substituted by the new specialized system designed after this evaluation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.