Abstract

The Lhasa to Nyingchi Expressway in Xizang made efforts to protect the ecological environment during its construction, but it still caused varying degrees of damage to the fragile ecosystems along the route. Accurately assessing the process of change in the ecological environment quality in this region holds significant research value. This study selected the Linzhi-to-Gongbo’gyamda section of the Lhasa-to-Nyingchi Expressway as the research area. Firstly, based on the remote sensing ecological index (RSEI), this study constructed an ecological environmental quality evaluation system for the Xizang region. Subsequently, using the Google Earth Engine (GEE) platform, sub-indicators were extracted, and the combination weighting method of game theory was employed to determine indicator weights. This process resulted in the calculation of the MRSEI for the study area from 2012 to 2020. Finally, by utilizing the spatial distribution of the MRSEI, monitoring the level of MRSEI changes, and employing the transition matrix, this study analyzed the changing trend of the ecological environmental quality from 2012 to 2020. The results indicate that the MRSEI are 0.5885, 0.5951, 0.5296, 0.6202, 0.59, 0.5777, 0.5898, 0.5703, and 0.5987, showing a gradual increasing trend with an initial decrease followed by an ascent. This trend is mainly attributed to concentrated road construction and subsequent ecological restoration, leading to an improvement in the restoration effect. Simultaneously, the ecological environmental quality remains relatively stable, with 69.5% of the region showing no change, and the remaining 30.5% experiencing improvement exceeding degradation. Specifically, there were significant improvements in the land with ecological quality levels categorized as poor, fair, moderate, and good. The types of degradation primarily involved lands originally classified as excellent and good degrading to good and moderate levels, respectively. The above results serve as a theoretical reference for the ecological restoration project of the Lhasa-to-Nyingchi Expressway.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call