Abstract

This paper discussed the reasons and the harms of high-speed railway's roadbed settlement in collapsible loess area. On the basis of the experimental simulation and mechanical analysis, the mechanism of fracture grouting is concluded, and a set of upper grouting test equipment is developed as well. Through a set of tests under different grouting pressures, and analyses on the soil's mechanical properties and displacement variations, a quadratic approximation formula is gained. Meanwhile, the mechanism for fracture grouting and the validity of laboratory simulation is tested and verified. In addition, the effect of fracture grouting on high-speed railway's roadbed consolidation in collapsible loess area is also got by fieldqs trial. The results of the current paper provide guide and reference for studying fracture grouting in collapsible loess area.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.