Abstract

We consider the High-Multiplicity Cyclic Job Shop Scheduling Problem. There are two objectives of interest: the cycle time and the flow time. We give several approximation algorithms after showing that a very restricted case is APX-hard.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call