Abstract

To provide a very powerful vanadium (V) beam with an intensity of at least 6 particle μA for synthesizing a new superheavy element (SHE) with atomic number Z = 119, we have developed a high-temperature oven (HTO) system to evaporate the metallic V powder inside the new superconducting (SC) electron cyclotron ion source. We successfully extracted a V13+ beam with a maximum beam intensity of 600 eμA with 2.8-kW microwave power and 900-W heating power of the HTO. Furthermore, from a systematic study of the dependence of the beam intensity on the microwave power and the HTO power, we successfully produced a V13+ beam of 300 eμA at a consumption rate of 3 mg/h, allowing a one-month duration continuous beam to carry out the SHE synthesis. In addition, to avoid serious damage to newly introduced SC acceleration cavities by beam losses, the beam should be transported with a well-controlled emittance. To efficiently limit the beam emittance, we employed a slit triplet consisting of three pairs of slits installed around the focus point of the low-energy beam transport. The first result of the emittance reduction was observed by a pepper-pot type emittance meter as a function of the acceptance of the slit triplet.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.