Abstract
This paper mainly introduces the characteristic of collapsible loess high fill roadbed, the observation method of collapsible loess high fill embankment settlement and measures need to be taken in construction and observation process of collapsible loess high fill embankment, through the settlement observation can be found in a timely fashion in roadbed construction process the settlement of foundation and roadbed soil. Thus it is concluded that the influence of construction process, construction method and filled soil type on the roadbed settlement. And sum up the settlement law.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have