Abstract

Abstract Hydro Power Valleys are large scale systems made of several power plants equipped with pumps and turbines located along the river or at the lower part of the penstocks. These plants are linked together by the electrical grid, and also by the water network. The latter is characterized by a significant time delay. The plant operations have also to comply with technical and environmental requirements concerning the level and flow rate variations. A HD-MPC solution is proposed to manage the large scale constrained and time delayed Hydro Power Valleys. The control consists of two layers. The upper layer optimizes the power profiles on a one-day horizon with a coarse step size. The lower level refines the control for shorter horizon and finer step size. Platform tests in simulation show that the coordination is able to improve the maneuverability of the Hydro Power Valley.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.