Abstract

Hydro power valleys (HPV) are large scale interconnected systems. All plant operations have to comply with technical and environmental requirements concerning level, flow rate and power variations. A two-layer hierarchical MPC solution, designed to manage the large scale constrained and time delayed HPV, is tested on a simulation platform. The upper layer optimizes the power profiles on a one-day horizon with a coarse step size. The lower level refines the control for a shorter horizon and step size. Simulations show that the coordination is able to improve the maneuverability of the HPV.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.