Abstract

We propose four algorithms for the no-wait flow shop scheduling problem. The objective is minimizing total completion time such that makespan is not greater than a maximum value. We address the problem with sequence-dependent setup times, an important production constraint that has never been considered for this problem before. The proposed algorithms start from an initial solution and then iterate through a process that destroys and repairs the incumbent solution in order to improve it. The methods are build combining distinct destruction and construction mechanisms, where the search intensification-diversification is explored at different levels. After an initial assessment, the best proposed algorithm (IG 4) is chosen to be compared with three literature methods (PAL, TOB, ISA-2) developed for similar problems. Computational experiments revealed that the overall average relative percentage deviation of PAL, TOB, ISA-2, and IG 4 are 10.97%, 4.44%, 2.07%, and 0.36%, respectively. The statistical analysis confirms that IG 4 significantly outperforms the existing methods.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.