Abstract

Storage or buffer capacities between successive machines in flowshop problems may be unlimited, limited or null. The last two cases can lead to blocking situations. In flowshop scheduling literature, many studies have been performed about classical flowshop problems and also about some problems with only one blocking situation between all machines.This paper deals with makespan minimization in flowshop scheduling problems where mixed blocking constraints are considered. After a problem description and definitions of different blocking constraints, a mathematical model is presented and heuristics are developed to propose quick solutions to these kinds of problems. Then, metaheuristics are used to improve found solutions. A comparison between heuristics and metaheuristics is then performed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.