Abstract

This article deals with makespan minimization in the flowshop scheduling problem under the condition of no intermediate storage between machines. A new blocking constraint met in several industrial problems is introduced, and several complexity results are presented from two to five machines. Some problems with four machines in which the new and the classical blocking constraints are mixed, are polynomial. Problems with only the new blocking constraint are polynomial for up to three machines. Although the complexity of the problem with four machines is left open, several cases are shown to be polynomial. Finally the problem with five machines is NP-hard.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.