Abstract

<p>Stonecutters Bridge is 1,018m main span cable stayed bridge in Hong Kong. The bridge incorporates a Wind and Structural Health Monitoring System (WASHMS) for monitoring the environmental loading condition such as traffic, temperature, wind and earthquake as well as the structural responses of the bridge including deflections, strains and long-term change of the bridge. A very powerful typhoon called Mangkhut, with 1- minute sustained wind speed up to 285km/h (180mph), struck Hong Kong on September 16, 2018. The response of Stonecutters Bridge under the action of this typhoon and the site-specific typhoon data have been recorded by the WASHMS. This paper analyses the measurement data of the typhoon loading and the bridge responses to demonstrate the use of health monitoring system for long span bridges and to verify the design of the bridge by comparison of the wind loading condition and stress conditions in major structural components.</p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.