Abstract
The study on delay of cellular communication is conducted by considering handover session in urban area. The experiment was performed on three distinct devices to study the handover delay based on 2G and 3G connectivity. Handover delay experienced by a moving vehicle was measured based on the data transmission latency during communication transfer session from previous cell network area that is passed by the vehicle to a new cell network area. From this experiment, the best selection of wireless communication module by considering the handover delay in urban area is determined by suited module to be use on connected car system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.